BASPA Plant
 
 

Echoing the Power of the Himalayas

Commissioned on 8th June 2013, our Baspa Plant is located in the higher reaches of the Himalayas, and has a generating capacity of 300 MW. Its diversion barrage is located in village Kuppa, near Sangla, and the powerhouse is located near village Karcham, upstream of the Karcham Dam.

The power to Empower

  • Its estimated generation capacity is 1213 GWh in a 90% dependable year
  • The plant’s underground powerhouse accommodates three 100 MW Pelton turbine-generating units
  • A 400 KV switchyard with generator transformers and gas-insulated switchgear is installed underground in a cavern
  • A double-circuit 400 KV transmission line feeds into the Jhakri sub-station

Resourcefulness Amplified

The Baspa plant’s location makes it necessary to make an optimum utilisation of resources.
 

Great Power. Greater Responsibility.

At Baspa, maintaining an ecological balance is our priority.
 
Statutory Document
Baspa II Multi Year Tariff (MYT) petition signed for the control period 2024-25 to 2028-29 Download
Environment Statement Baspa-II HEP - 2022-23 Download
Environment Statement Baspa-II HEP - 2021-22 Download
Consent to Operate Download
Environment Statement (Form V) - 2021-22 Download
Baspa II True up petition 2019-2020 to 2021-22 Download
HPERC letter dt 07.12.22 Download
HPERC letter dt 15.10.22 Download
Kuppa Barrage - Emergency Action Plan Download
Baspa True up petition 2017-18 to 2018-19 Download
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 1 Download
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 2 Download
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 3 Download
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 4 Download
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 5 Download
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 6 Download
Baspa II Multi Year Tariff (MYT) petition for the 4th control period 2019-24 Download
Baspa II True Up Petition for 3rd Control Period 2015-19 Download
images history images history

INNOVATIONS

Awards

  • Best Operating Hydro Power Plant from IPPAI (Independent Power Producer Association of India) – 2nd Runners-Up for Year 2015-16.
  • Gold Shield for Meritorious Performance from the Ministry of Power, Govt. of India for the Year 2013-14.