Commissioned on 8th June 2013, our Baspa Plant is located in the higher reaches of the Himalayas, and has a generating capacity of 300 MW. Its diversion barrage is located in village Kuppa, near Sangla, and the powerhouse is located near village Karcham, upstream of the Karcham Dam.
The power to Empower
- Its estimated generation capacity is 1213 GWh in a 90% dependable year
- The plant’s underground powerhouse accommodates three 100 MW Pelton turbine-generating units
- A 400 KV switchyard with generator transformers and gas-insulated switchgear is installed underground in a cavern
- A double-circuit 400 KV transmission line feeds into the Jhakri sub-station
Resourcefulness Amplified
The Baspa plant’s location makes it necessary to make an optimum utilisation of resources.
Great Power. Greater Responsibility.
At Baspa, maintaining an ecological balance is our priority.
Statutory Document | |
---|---|
Baspa II Multi Year Tariff (MYT) petition signed for the control period 2024-25 to 2028-29 | Download |
Environment Statement Baspa-II HEP - 2022-23 | Download |
Environment Statement Baspa-II HEP - 2021-22 | Download |
Consent to Operate | Download |
Environment Statement (Form V) - 2021-22 | Download |
Baspa II True up petition 2019-2020 to 2021-22 | Download |
HPERC letter dt 07.12.22 | Download |
HPERC letter dt 15.10.22 | Download |
Kuppa Barrage - Emergency Action Plan | Download |
Baspa True up petition 2017-18 to 2018-19 | Download |
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 1 | Download |
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 2 | Download |
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 3 | Download |
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 4 | Download |
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 5 | Download |
HERC for 1st discrepancy_MYT 2019-24 - Invitation to collaborate - Part 6 | Download |
Baspa II Multi Year Tariff (MYT) petition for the 4th control period 2019-24 | Download |
Baspa II True Up Petition for 3rd Control Period 2015-19 | Download |