COAL Terminal:

Paradip East Quay Coal Terminal Pvt. Ltd. - 30 MTPA capacity by 2021.

JSWIL has secured the redevelopment of the existing EQ1, EQ2 and EQ3 terminals to handle Coal export.

  • Quay length of 686m.
  • Long berth with a present draft of 12m shall be deepened and strengthened to accommodate large Cape Size Vessels.
  • Predominantly being developed for exporting / coastal movement of domestic coal from Mahanadi Coal Fields,
  • Facility would be equipped with rail receiving station for bottom discharge wagons, transporting, stacking & reclaiming of cargo and loading for exports / Coastal Movement. 
  • Terminal has two 6x6 track hoppers for receiving Cargo through bottom discharge of wagons, mechanized conveying, stacking & reclaiming using state of art stacker cum reclaimers and two ship loaders of 7000 MT each for loading two vessels simultaneously for exports / Coastal Movement.

The terminal when developed would have a capacity upwards of 30 million tons per annum by August 2021.

 

Transforming Coastal Shipping: 

From Handymax to Cape vessel handling, the Terminal would open up avenues for Coastal Shipping by achieving economies of scale

Features - COAL Terminal

600m Berth Length, LOA 295m, Breadth 42m Max vessel size

33 Meters

18.5m Draught, 700m Breakwater Length